Construction has started on a shared parkway into Logan Gardens, aimed at enhancing accessibility for pedestrians, cyclists, and motorists.
The parkway will extend through the south-eastern corner of the Logan Gardens, connecting the Civic Parade carpark to the top of Rosny Court (off Karri Avenue) on the park’s southern boundary.
It will provide pedestrians, cyclists and vehicles with better access to Logan Garden’s facilities, which include an adventure playground, a water play area, a basketball court, toilets and fitness equipment.
Pedestrians and cyclists will have priority access along the parkway, with vehicles limited to 10km/h.
The parkway will include parking bays, seating and artworks.
Safety cameras and lighting will also be installed, and the existing carpark will be expanded.
Construction is expected to finish by June 2024, and council says local residents will be notified in advance of any impacts to parking, driveway or footpath access in the area.
There may also be temporary interruptions to local water, sewer and power services as works are carried out.


